Leigh - Sewage Summary

 
Loading animation
Summary for Leigh 2021-2023
3656 Spills | 25119.7 hours

In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Leigh 3656 time(s).
Sewage has been discharged for a total of 25119.7 hour(s).
In total: 2.86 year(s)* of elapsed time.

85.3
The stations, on average, have been monitoring for 85.3% of the total time we have data for.



Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Atherton Brook Bedford Brook Bedford Brook Trib Glaze Brook Bedford Brook, A Tributary Of Glaze Brook Bowers Brook Collier Brook Collier Brook A Tributary Of Bedford Brook Colling Lane Brook, Pen Leach Cooling Lane Brook Leading Into Pen Leach Brook Cop Brook Culverted Section Of Dog Pool Brook Trib Of Bordsdane Brook Via Surface Water Sewer Dog Pool Brook Dog Pool Brook Via Sws Hindsford Brook Hindsford Brook Via Surface Water Sewer Hindsford Brook/Shakerley Broo Landside Brook Via Surface Water Sewer Moss Brook Pen Leach Brook Pen Leach Brook (Trib Of River Glaze) Pennington Brook Pennington Brook (Glaze) Pennington Brook Via Surface Water Sewer Pennington Brook Via Sws River Glaze Shakerley Brook Shakerley Brook (Trib Of Hindsford Brook) Shakerley Brook In Culvert Trib Of Hall Lee Brook Tributary Of Hall Lee Brook Westleigh Brook
View Summaries Nearby
Leigh - Yearly Summary
Summary for Year 2023
1468 Spills | 11378.2 hours

In 2023, sewage was discharged in, or near (~3mi.), Leigh 1468 time(s).
Sewage was discharged for a total of 11378.2 hour(s).
In total: 1.29 year(s)* of elapsed time.

92
The stations, on average, have been monitoring for 92% of the total time in 2023.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2023
Summary for Year 2022
820 Spills | 4065.9 hours

In 2022, sewage was discharged in, or near (~3mi.), Leigh 820 time(s).
Sewage was discharged for a total of 4065.9 hour(s).
In total: 0.46 year(s)* of elapsed time.

81.7
The stations, on average, have been monitoring for 81.7% of the total time in 2022.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2022
Summary for Year 2021
1368 Spills | 9675.5 hours

In 2021, sewage was discharged in, or near (~3mi.), Leigh 1368 time(s).
Sewage was discharged for a total of 9675.5 hour(s).
In total: 1.1 year(s)* of elapsed time.

82.2
The stations, on average, have been monitoring for 82.2% of the total time in 2021.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2021
* - Elapsed time, in years or days, is the sum of time across the station(s) for which discharge event(s) have occured.
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved