In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Abram 2508 time(s). Sewage has been discharged for a total of 13471.2 hour(s). In total: 1.53 year(s)* of elapsed time.
72.5 The stations, on average, have been monitoring for 72.5% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Bordsdane Brook Borsdane Brook Borsdane Brook Via A Surface Water Sewer Brookside Brook Culverted Section Of Dog Pool Brook Trib Of Bordsdane Brook Via Surface Water Sewer Culverted Section Of Hockery Brook Culvrtd Section Hockery Brook Dog Pool Bk,Trb Of Borsdane Bk Dog Pool Brook Dog Pool Brook Via Sws Dog Pool Brook, Trib Of Bordsdane Brook Hey Brook Hey Brook (Trib Of River Glaze) Hey Brook Via A Surface Water Sewer Hey/Borsdane Brook Hockery Brook Ince Brook Ince Brook (Trib Of River Douglas) Marsh Brook Mill Brook Millingford (Newton) Brook Millingford Brook Millingford Brook Via Surface Water Sewer Poolstock Brook Trib Brookside Brook Trib Of Hey Brook Tributary Of Brookside Brook Tributary Of Hey Brook Tributary Of Wistaston Brook Trubutary Of Hey Brook Unnamed Trib Of Coffin Lane Brook
View Summaries Nearby
Abram - Yearly Summary
Summary for Year 2023
1087 Spills | 7456.7 hours
In 2023, sewage was discharged in, or near (~3mi.), Abram 1087 time(s). Sewage was discharged for a total of 7456.7 hour(s). In total: 0.85 year(s)* of elapsed time.
82.8 The stations, on average, have been monitoring for 82.8% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
575 Spills | 1882.9 hours
In 2022, sewage was discharged in, or near (~3mi.), Abram 575 time(s). Sewage was discharged for a total of 1882.9 hour(s). In total: 0.21 year(s)* of elapsed time.
67.3 The stations, on average, have been monitoring for 67.3% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
846 Spills | 4131.5 hours
In 2021, sewage was discharged in, or near (~3mi.), Abram 846 time(s). Sewage was discharged for a total of 4131.5 hour(s). In total: 0.47 year(s)* of elapsed time.
67.4 The stations, on average, have been monitoring for 67.4% of the total time in 2021. Stations with missing data have been excluded from this calculation.