In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Astley 2863 time(s). Sewage has been discharged for a total of 18982.7 hour(s). In total: 2.16 year(s)* of elapsed time.
87.3 The stations, on average, have been monitoring for 87.3% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Astley Brook Atherton Brook Bedford Brook Bedford Brook Trib Glaze Brook Bedford Brook, A Tributary Of Glaze Brook Bowers Brook Collier Brook Collier Brook A Tributary Of Bedford Brook Colling Lane Brook, Pen Leach Cooling Lane Brook Leading Into Pen Leach Brook Ellen Brook Hindsford Brook Hindsford Brook Via Surface Water Sewer Hindsford Brook/Shakerley Broo Honksford Brook Honksford Brook (Trib Of Glaze Brook) Little Hulton Stream Moss Brook Pen Leach Brook Pen Leach Brook (Trib Of River Glaze) Pennington Brook Via Surface Water Sewer Shakerley Brook Shakerley Brook (Trib Of Hindsford Brook) Shakerley Brook In Culvert Shaw Brook Sniggley Ditch Trib Of Honksford Brook Tributary (Culverted Section) Of Honksford Brook Via Surface Water Sewer Tributary Of Ellen Brook Tributary Of Honksford Brook
View Summaries Nearby
Astley - Yearly Summary
Summary for Year 2023
1127 Spills | 7429.5 hours
In 2023, sewage was discharged in, or near (~3mi.), Astley 1127 time(s). Sewage was discharged for a total of 7429.5 hour(s). In total: 0.84 year(s)* of elapsed time.
88.2 The stations, on average, have been monitoring for 88.2% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
708 Spills | 4182.5 hours
In 2022, sewage was discharged in, or near (~3mi.), Astley 708 time(s). Sewage was discharged for a total of 4182.5 hour(s). In total: 0.47 year(s)* of elapsed time.
84.6 The stations, on average, have been monitoring for 84.6% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
1028 Spills | 7370.7 hours
In 2021, sewage was discharged in, or near (~3mi.), Astley 1028 time(s). Sewage was discharged for a total of 7370.7 hour(s). In total: 0.84 year(s)* of elapsed time.
89 The stations, on average, have been monitoring for 89% of the total time in 2021. Stations with missing data have been excluded from this calculation.