In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Atherton 2981 time(s). Sewage has been discharged for a total of 14638.4 hour(s). In total: 1.67 year(s)* of elapsed time.
89.3 The stations, on average, have been monitoring for 89.3% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Astley Brook Atherton Brook Bedford Brook Collier Brook Collier Brook A Tributary Of Bedford Brook Colling Lane Brook, Pen Leach Cooling Lane Brook Leading Into Pen Leach Brook Culverted Trib Cunningham Brk Culverted Tributary Of Cunningham Brook Via Surface Water Sewer Hindsford Brook Hindsford Brook Via Surface Water Sewer Hindsford Brook/Shakerley Broo Honksford Brook Honksford Brook (Trib Of Glaze Brook) Moss Brook Pen Leach Brook Pen Leach Brook (Trib Of River Glaze) Shakerley Brook Shakerley Brook (Trib Of Hindsford Brook) Shakerley Brook In Culvert Trib Of Hall Lee Brook Tributary Of Hall Lee Brook Westleigh Brook
View Summaries Nearby
Atherton - Yearly Summary
Summary for Year 2023
1217 Spills | 5969.2 hours
In 2023, sewage was discharged in, or near (~3mi.), Atherton 1217 time(s). Sewage was discharged for a total of 5969.2 hour(s). In total: 0.68 year(s)* of elapsed time.
95 The stations, on average, have been monitoring for 95% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
660 Spills | 2391 hours
In 2022, sewage was discharged in, or near (~3mi.), Atherton 660 time(s). Sewage was discharged for a total of 2391 hour(s). In total: 0.27 year(s)* of elapsed time.
84.6 The stations, on average, have been monitoring for 84.6% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
1104 Spills | 6278 hours
In 2021, sewage was discharged in, or near (~3mi.), Atherton 1104 time(s). Sewage was discharged for a total of 6278 hour(s). In total: 0.71 year(s)* of elapsed time.
88.2 The stations, on average, have been monitoring for 88.2% of the total time in 2021. Stations with missing data have been excluded from this calculation.