Platt Bridge - Sewage Summary

 
Loading animation
Summary for Platt Bridge 2021-2023
2361 Spills | 13520.6 hours

In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Platt Bridge 2361 time(s).
Sewage has been discharged for a total of 13520.6 hour(s).
In total: 1.54 year(s)* of elapsed time.

72.8
The stations, on average, have been monitoring for 72.8% of the total time we have data for.



Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
0 Bordsdane Brook Borsdane Brook Borsdane Brook Via A Surface Water Sewer Brookside Brook Clarington Brook Culverted Sec. Of Park Brook, Trib Of Ince Brook And River Douglas Culverted Section Of Dog Pool Brook Trib Of Bordsdane Brook Via Surface Water Sewer Culverted Section Of Hockery Brook Culvrtd Section Hockery Brook Dog Pool Bk,Trb Of Borsdane Bk Dog Pool Brook Dog Pool Brook Via Sws Dog Pool Brook, Trib Of Bordsdane Brook Hey Brook Hey Brook (Trib Of River Glaze) Hey Brook Via A Surface Water Sewer Hey/Borsdane Brook Hockery Brook Ince Brook Ince Brook (Trib Of River Douglas) Mill Brook Millingford Brook Millingford Brook Via Surface Water Sewer Park Brook Poolstock Brook River Douglas River Douglas Via Surface Water Sewer Smithy Brook Smithy Brook Via Surface Water Sewer Smithy Brook Via Sws Trib Brookside Brook Trib Of Hey Brook Tributary Of Brookside Brook Tributary Of Hey Brook Tributary Of Park Brook Tributary Of Wistaston Brook Trubutary Of Hey Brook Unnamed Trib Of Coffin Lane Brook
View Summaries Nearby
Platt Bridge - Yearly Summary
Summary for Year 2023
1028 Spills | 7502.1 hours

In 2023, sewage was discharged in, or near (~3mi.), Platt Bridge 1028 time(s).
Sewage was discharged for a total of 7502.1 hour(s).
In total: 0.85 year(s)* of elapsed time.

84.3
The stations, on average, have been monitoring for 84.3% of the total time in 2023.
Stations with missing data have been excluded from this calculation.


Summary for Year 2022
552 Spills | 1931.7 hours

In 2022, sewage was discharged in, or near (~3mi.), Platt Bridge 552 time(s).
Sewage was discharged for a total of 1931.7 hour(s).
In total: 0.22 year(s)* of elapsed time.

67.5
The stations, on average, have been monitoring for 67.5% of the total time in 2022.
Stations with missing data have been excluded from this calculation.


Summary for Year 2021
781 Spills | 4086.7 hours

In 2021, sewage was discharged in, or near (~3mi.), Platt Bridge 781 time(s).
Sewage was discharged for a total of 4086.7 hour(s).
In total: 0.46 year(s)* of elapsed time.

66.7
The stations, on average, have been monitoring for 66.7% of the total time in 2021.
Stations with missing data have been excluded from this calculation.


* - Elapsed time, in years or days, is the sum of time across the station(s) for which discharge event(s) have occured.
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved