Hollingworth - Sewage Summary

 
Loading animation
Summary for Hollingworth 2021-2023
3387 Spills | 26313.9 hours

In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Hollingworth 3387 time(s).
Sewage has been discharged for a total of 26313.9 hour(s).
In total: 3 year(s)* of elapsed time.

88.7
The stations, on average, have been monitoring for 88.7% of the total time we have data for.



Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
A Culverted Section Of An Unnamed Tributary Of The River Tame Clvrt Sec Unnamed Trib Rvrtame Clvrt Sect Swineshaw Brook Culverted Section Of Swineshaw Brook, A Tributary Of The River Tame Culverted Tributary Of Glossop Brook Via Surface Water Sewer Glossop Brook Glossop Brook Via Surface Water Sewer Hurst Clough Brook Long Clough Brook River Blakewater River Etherow River Etherow, Via A Surface Water Sewer Shelf Brook Via A Surface Water Sewer Shelf Brook Via Sws Stocks Brook Swineshaw Brook Via Surface Water Sewer Swineshaw Brook Via Sws Syke Culvert Leading Into River Etherow Syke Culvert To River Etherow Trib Glossop Brook Via Sws Trib River Etherow Tributary Of River Etherow Unnamed Trib Of Sandwith Beck
View Summaries Nearby
Hollingworth - Yearly Summary
Summary for Year 2023
1360 Spills | 9021.6 hours

In 2023, sewage was discharged in, or near (~3mi.), Hollingworth 1360 time(s).
Sewage was discharged for a total of 9021.6 hour(s).
In total: 1.02 year(s)* of elapsed time.

93.5
The stations, on average, have been monitoring for 93.5% of the total time in 2023.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2023
Summary for Year 2022
900 Spills | 6560 hours

In 2022, sewage was discharged in, or near (~3mi.), Hollingworth 900 time(s).
Sewage was discharged for a total of 6560 hour(s).
In total: 0.74 year(s)* of elapsed time.

83.4
The stations, on average, have been monitoring for 83.4% of the total time in 2022.
Stations with missing data have been excluded from this calculation.


Worst Stations in 2022
Summary for Year 2021
1127 Spills | 10732.2 hours

In 2021, sewage was discharged in, or near (~3mi.), Hollingworth 1127 time(s).
Sewage was discharged for a total of 10732.2 hour(s).
In total: 1.22 year(s)* of elapsed time.

89.3
The stations, on average, have been monitoring for 89.3% of the total time in 2021.
Stations with missing data have been excluded from this calculation.


* - Elapsed time, in years or days, is the sum of time across the station(s) for which discharge event(s) have occured.
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved