In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Congleton 2138 time(s). Sewage has been discharged for a total of 10653.4 hour(s). In total: 1.21 year(s)* of elapsed time.
90 The stations, on average, have been monitoring for 90% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Biddulph Brook Biddulph Brook A Tributary Of River Dane Biddulph Brook, A Tributary Of River Dane Biddulph Brook, Trib Rvr Dane Dane In Shaw Brook Dane In Shaw Brook / Biddulph Brook Dane-In-Shaw Brook Loach Brook Loach Brook A Tributary Of The River Dane Newton Brook River Dane River Dane Via A Surface Water Sewer River Dane Via A Surface Water Sewer. River Dane Via S/Water Sewer River Dane Via Surface Water Sewer River Dane Via Sws River Douglas Trib Of Dane-In-Shaw Brook Tributary Of Dane-In-Shaw Brook
View Summaries Nearby
Congleton - Yearly Summary
Summary for Year 2023
1002 Spills | 6535.3 hours
In 2023, sewage was discharged in, or near (~3mi.), Congleton 1002 time(s). Sewage was discharged for a total of 6535.3 hour(s). In total: 0.74 year(s)* of elapsed time.
97.4 The stations, on average, have been monitoring for 97.4% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
595 Spills | 2254.6 hours
In 2022, sewage was discharged in, or near (~3mi.), Congleton 595 time(s). Sewage was discharged for a total of 2254.6 hour(s). In total: 0.25 year(s)* of elapsed time.
87.3 The stations, on average, have been monitoring for 87.3% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
541 Spills | 1863.5 hours
In 2021, sewage was discharged in, or near (~3mi.), Congleton 541 time(s). Sewage was discharged for a total of 1863.5 hour(s). In total: 0.21 year(s)* of elapsed time.
85.3 The stations, on average, have been monitoring for 85.3% of the total time in 2021. Stations with missing data have been excluded from this calculation.