River Basins . . . Tyne and Wear North Cambois Pumping Station
Loading animation

North Sea at North Cambois Pumping Station

This station collects multiple metrics

This is a sewage discharge monitoring station, which is usually a type of Event Duration Monitor (EDM).
These stations themselves are designed to mitigate the impact of heavy rainfall by discharging, under permitted conditions, any overflow into a water body. They are often actively discharging during flood events.
This page presents the data acquired by the monitoring system for this discharge station.
Sewage Reports that include this Station
Operational Summary - 2023-2023
North Sea | 3 Spills |
0.2 hours | 0


The declared body of water receiving this discharge is the "North Sea"
This station has discharged sewage 3 time(s).
The station has discharged for a total of 0.2 hour(s).
This is 0% of the time which we have data for.
In total: 0 day(s)* of elapsed time.

22 | 6832.8 hours
This monitor has been operational for 22% of its total time we have data for.
There are 6832.8 hours unaccounted for due to downtime of the monitor.


The worst year in our records for the "North Cambois Pumping Station" is 2023, discharging sewage for 0.2 hours of the year.

Uptimes below 90% (red line) should be accompanied by a reason
*This is total time in days, not individual days.
Yearly Summary
Most Recent Year - 2023
North Sea | 3 Spills |
0.2 hours | 0

The declared body of water receiving this discharge is the "North Sea"
This station discharged sewage 3 time(s) during 2023.
The station discharged for a total of 0.2 hour(s).
This is around 0 day(s)* or 0% of the year.

22.8 | 6755.7 hours
This monitor was operational for 22.8% of the year.
Leaving 6755.7 hours unaccounted for in the data.
This falls below the 90% threshold where a reason should be given

The following reasons have been given for the downtime in 2023:
Comms Failure / Issue

The following description has been given for downtime related actions intended, or taken, by the operator in 2023:
Resolved - Jul


*This is total time in days, not individual days of the year.

Permit & Governance

AttributeValue
Governing BodyThe Environment Agency
OperatorNorthumbrian Water
Primary Permit #226/1155
Secondary Permit #6NW800577


FloodMapper is not affiliated with this monitoring stations operator(s) or any other entities that may be mentioned on this page.
All trademarks and registered trademarks are the property of their respective owners.

Operator comments are presented, unedited, as they were received by us and do not reflect our views or position

Local Information
Nearby Flood Warnings
None
Nearby Alert Areas
No flood warning icon

Tyne and Wear coast


Nearby Stations
Blyth
Nearby Sewage Discharge Stations
20 Wansbeck Street
20 Wansbeck Street North Seaton
Back Lodge Terrace CSO
Bank Top CSO
Bates Colliery SPS
Bedside CSO
Bevan House
Bevan House Dent Street
Blyth (New) Sewage Treatment Works
Blyth No 2 Ps Links Road
Blyth No5 SPS
Blyth No6 SPS
Briardale Road CSO
Briardale Road CSO
Briardale Road CSO Taylor Street
Brierdene Pumping Station
Browns Point CSO
Cambois Sewage Treatment Works
Cowpen Road CSO
Cramlington Sewage Treatment Works
Cramlington Sewage Treatment Works CSO Inlet
CSO Salterfen Su47
CSO Sunderlans Gas Works
Dukes Walk CSO
Dukes Walk CSO
Dukes Walk CSO (Nty031) (A63)
Dukes Walk CSO (Nty031) (A63)
Easington Outfall
Easington Outfall Horden Dene SPS
East Hendon Road CSO
Ferguson Motor Repairs CSO 2008
Glaxo West CSO
Grange Park CSO (Wk016)
Hartley Caravan Park Ps
Hendon Preliminary Treatment Works
Horden STW
Hughbourne Street CSO
John Street CSO
Limekiln Gill Sampling Pt. For Ea18
Links Road CSO
Lyndhurst Road CSO
Mainsforth Terrace CSO Su63
Newbiggin Sewage Treatment Works
Newbiggin Sso (Wilkie Terrace)
North Blyth Pumping Station
North Parade High Level CSO (A52)
North Point CSO
North Point CSO (Nty049)
North Seaton Level Crossing CSO
Percy Road High Level CSO
Redwell Seage Pumping Station
Redwell SPS
Ridley Street SPS
Roker Storm Sewage Overflow
Ryhope Sso
Seaburn North CSO
Seaburn South CSO
Seaham Sewage Treatment Works
Seaham South Dock CSO 1302
Seaton North Hotel CSO (Wk013)
Seaton Sluice Ps
Sharpness Point Ps
Sharpness Point SPS
Sleekburn East CSO
Solingen Estate CSO
South Blyth Harbour CSO
Warsdell Street Pumping Station
Watts Slope High Level CSO (A56)
Welwyn Factory CSO
West Sleekburn Farm CSO
Whitburn Steel Ps
Whitburn Storm Sewage Overflow
Station Data Information
Station overseen (meaning either provided, or regulated) by: The Environment Agency
The information displayed here is used under license. We are not affiliated with any governing, or other, bodies. Nor do they necessarily endorse us, or us them.
Please note that FloodMapper does not verify or check the accuracy of the data provided by third parties. The data is used as received from the source. Any underlying errors, inconsistencies, or inaccuracies in the original data will be reflected in the information presented on our platform. Users are advised to exercise their own judgment and caution when using the data for decision-making purposes.
Information about our data sources and licenses can be found
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved