In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), Shevington Vale 1456 time(s). Sewage has been discharged for a total of 6680.7 hour(s). In total: 0.76 year(s)* of elapsed time.
71.7 The stations, on average, have been monitoring for 71.7% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
Ackhurst Brook (Trib River Douglas) Ackhurst Brook Trib R Douglas Billy Pit Brook (Trib Of Leeds & Liverpool Canal) Billy Pit Brook Lpool Canal Close Brook (Trib River Douglas) Close Brook Trib Of R Douglas Culverted Trib. River Douglas Dean Brook (Tributary Of River Douglas) Dean Brook Trid Of R Douglas Mill Brook Mill Brook, Tributary Of The Leeds Liverpool Canal River Douglas River Douglas Via Surface Water Sewer River Douglas Via Sws The River Douglas Trib Of Pendleton Brook By Sws
View Summaries Nearby
Shevington Vale - Yearly Summary
Summary for Year 2023
554 Spills | 2071.4 hours
In 2023, sewage was discharged in, or near (~3mi.), Shevington Vale 554 time(s). Sewage was discharged for a total of 2071.4 hour(s). In total: 0.23 year(s)* of elapsed time.
81 The stations, on average, have been monitoring for 81% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
502 Spills | 3291 hours
In 2022, sewage was discharged in, or near (~3mi.), Shevington Vale 502 time(s). Sewage was discharged for a total of 3291 hour(s). In total: 0.37 year(s)* of elapsed time.
66.1 The stations, on average, have been monitoring for 66.1% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
400 Spills | 1318.3 hours
In 2021, sewage was discharged in, or near (~3mi.), Shevington Vale 400 time(s). Sewage was discharged for a total of 1318.3 hour(s). In total: 0.15 year(s)* of elapsed time.
68.1 The stations, on average, have been monitoring for 68.1% of the total time in 2021. Stations with missing data have been excluded from this calculation.