River Basins Howdon STW CSO Inlet
Loading animation

River Tyne at Howdon STW CSO Inlet

This is a sewage discharge monitoring station, which is usually a type of Event Duration Monitor (EDM).
These stations themselves are designed to mitigate the impact of heavy rainfall by discharging, under permitted conditions, any overflow into a water body. They are often actively discharging during flood events.
This page presents the data acquired by the monitoring system for this discharge station.
Sewage Reports that include this Station
Operational Summary - 2021-2022
River Tyne | 18 Spills |
18.1 hours | 0.1


The declared body of water receiving this discharge is the "River Tyne"
This station has discharged sewage 18 time(s).
The station has discharged for a total of 18.1 hour(s).
This is 0.1% of the time which we have data for.
In total: 0 day(s)* of elapsed time.

100 | 0 hours
This monitor has been operational for 100% of its total time we have data for.
There are 0 hours unaccounted for due to downtime of the monitor.


The worst year in our records for the "Howdon STW CSO Inlet " is 2021, discharging sewage for 14.7 hours of the year.

Uptimes below 90% (red line) should be accompanied by a reason
*This is total time in days, not individual days.
Yearly Summary
Most Recent Year - 2022
River Tyne | 4 Spills |
3.3 hours | 0.03

The declared body of water receiving this discharge is the "River Tyne"
This station discharged sewage 4 time(s) during 2022.
The station discharged for a total of 3.3 hour(s).
This is around 0 day(s)* or 0.03% of the year.

100 | 0 hours
This monitor was operational for 100% of the year.
Leaving 0 hours unaccounted for in the data.


*This is total time in days, not individual days of the year.

Permit & Governance

AttributeValue
Governing BodyThe Environment Agency
OperatorNorthumbrian Water
Primary Permit #235/1804
Secondary Permit #235/1804

2021
River Tyne | 14 Spills |
14.7 hours | 0.16

The declared body of water receiving this discharge is the "River Tyne"
This station discharged sewage 14 time(s) during 2021.
The station discharged for a total of 14.7 hour(s).
This is around 0 day(s)* or 0.16% of the year.

100 | 0 hours
This monitor was operational for 100% of the year.
Leaving 0 hours unaccounted for in the data.


*This is total time in days, not individual days of the year.

Permit & Governance

AttributeValue
Governing BodyThe Environment Agency
OperatorNorthumbrian Water
Primary Permit #235/1804
Secondary Permit #235/1804


FloodMapper is not affiliated with this monitoring stations operator(s) or any other entities that may be mentioned on this page.
All trademarks and registered trademarks are the property of their respective owners.

Operator comments are presented, unedited, as they were received by us and do not reflect our views or position

Local Information
Nearby Flood Warnings
None
Nearby Alert Areas
None
Nearby Stations
No nearby stations
Nearby Sewage Discharge Stations
Bedford Street CSO Nty057
Blackett Street
Blackett Street CSO
Blackett Street Jarrow
Boldon Colliery Fenwich St No56 CSO
Boldon Colliery Fenwick Street CSO
Burdon Main Row CSO
Burn Closes CSO
Caledonian St / William St D17-103 Sty056
Cemetery Road CSO
Church Bank CSO
Coronation St CSO
CSO At Bedesway
CSO At East Holborn West
CSO At Manhole 49 Howden Road
Davy Bank Pumping Station
Davy Bank SPS
Don Valley Pumping Station
East Holborn East CSO
Eden Walk CSO
Eldon Street CSO
Fish Quay CSO
Harton Low Staithes (Mill Dam) CSO
Harton Low Staithes CSO
Howdon (Adjacent A19 Roundabout)CSO
Howdon Road CSO (Nty 040)
Howdon STW
Howdon STW
Howdon STW CSO Inlet North Bank
Jarrow Road Pumping Station
Jarrow Slake SPS
Killingworth Wagonway CSO
Lamport CSO
Marine Drive Pumping Station
Mindrum Terrace CSO
Mitre Place CSO
New Quay CSO Nc058
New York CSO
North Groyne Pumping Station
North Groyne SPS
Nty025 Willington Quay CSO 6
Percy Main CSO
Pilot Street Pumping Station
Point Pleasant Pumping Station
Potter Street Pumping Station
Potter Street SPS
Roman Road CSO
Smith Street Pumping Station
South Shields Interceptor Bs/104
Springwell Park CSO
Station Road CSO G020
Station Road/Swan Hunters CSO
Stephenson Street Pumping Station
Stephenson Street SPS
Swaddles Hole CSO
Temple Street CSO
Tudor Road CSO
Tyne Street SPS
Tyne View Terrace Ps
Tyneside CSO (No B5/301)
Tyneside CSO (No B5/301) Newland Drive
Tyneside CSO B5/201
Union Quay CSO
Wagonway Road Pumping Station
Wallsend Burn SPS
Wallsend Burn Western Road/Rosehill Road P St
Wapping Street CSO
Waterville Road CSO
West Holborn South CSO
West Of Hedworth Lane CSO
William Street CSO
Willington Quay CSO 6 Phillipson Street Rosehill
Station Data Information
Station overseen (meaning either provided, or regulated) by: The Environment Agency
The information displayed here is used under license. We are not affiliated with any governing, or other, bodies. Nor do they necessarily endorse us, or us them.
Please note that FloodMapper does not verify or check the accuracy of the data provided by third parties. The data is used as received from the source. Any underlying errors, inconsistencies, or inaccuracies in the original data will be reflected in the information presented on our platform. Users are advised to exercise their own judgment and caution when using the data for decision-making purposes.
Information about our data sources and licenses can be found
 
FloodMapper is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright © FloodMapper 2023-2024.
All Rights Reserved